8 months gone, key stretch in Gurgaon dug up for sewer work still not repaired | Gurgaon News
A 900-metre stretch connecting the area near the ESI hospital to the main pumping station was dug up last year for laying a sewer line Gurgaon: Eight months after sewer work was completed on an 18-metre-wide road in Sector 9A, residents say the stretch continues to remain unrepaired.A 900-metre stretch connecting the area near the…
