Ahmedabad: AMC began installing safety railings to separate footpaths and roads to protect pedestrians, but their movement has become more hobbled because many footpaths have been encroached upon by mobile towers and electricity infrastructure. Trees are other hurdles on footpaths.These difficulties hinder pedestrians on five roads across the city. Safety railings for footpaths are being installed on several stretches, including the road from Vadaj Circle to Gandhi Ashram, GST Bridge Road in Ranip, RH Patel College Road and Saurabh School Road in Nava Vadaj, and Sanjivani Hospital Road in Bodakdev.“Pedestrian safety was discussed during the standing committee meeting on April 3, 2025, because even pedestrians walking on footpaths meet with accidents,” a source said. “Discussions led to the creation of the ‘Pedestrian Footpath Safety Railing’ concept. Major thoroughfares in the city — including Ashram Road, CG Road, 132 Feet Ring Road, Anandnagar Road, Drive-In Road, and Sindhu Bhavan Road — are hazardous for pedestrians.”None of these major roads has railings for footpaths, the source said.“A pilot project for the railings was planned on two stretches: the 3-km-long CG Road and the 3.4-km-long Gujarat University Road,” the source said. “However, implementation on these two roads has still not taken place.”Sources said that engineering departments across various AMC zones floated tenders to install pedestrian safety railings on roads within their jurisdictions, and installation is currently under way.“But, on many footpaths, pedestrians have little space to walk. Blockages include pay-and-use toilets,” a source said. “As a result, installing railings between roads and footpaths turns some stretches into dead-end routes.”On other stretches, walking becomes impossible because railings prevent pedestrians from stepping down onto the road to bypass an encroachment on the footpath, the source said.“Consequently, people avoid using the footpaths altogether. In areas such as Nava Vadaj, Juna Vadaj, Usmanpura, and Bodakdev, the newly installed railings have effectively rendered the footpaths unusable,” the source said.Speaking on condition of anonymity, an AMC official stated, “In 2007, areas such as Jodhpur, Vejalpur, Bodakdev, Thaltej, Gota, Vastral, Chandkheda, and Motera were merged into Ahmedabad’s city limits, followed by Bopal, Ghuma, Kathwada, and Nana Chiloda in 2020.”The official said, “While AMC spends crores of rupees on resurfacing roads wider than 60 feet, footpath construction is not included in those works. Over the past three years, new roads were constructed in Chandkheda, Motera, Bopal, Ghuma, Bodakdev, Thaltej, and Gota, yet no footpaths were built alongside them.”BOX72% of city roads don’t have footpathsIn its 2023–24 budget, AMC published data on the status of footpaths in the city. Page 104 of the budget book states that 72% of Ahmedabad’s roads lack footpaths. The city’s total road network spans 2,634 km, comprising 1,729 km of roads up to 60 feet wide and 905 km of roads between 60 feet and 200 feet wide. Out of the entire 2,634 km road network, footpaths exist along only 731.43 km.
