Pune: A water supply pipeline operated by the civic body was damaged near Ambegaon on Sunday, leading to thousands of litres of water being wasted amid already depleting resources.According to a statement issued by Pune Municipal Corporation (PMC), the 1,400 mm-diameter water transmission pipeline connecting the Vadgaon Water Treatment Plant to Mohammadwadi ruptured near Aishwarya Banquet Hall in the Shivshrushti area of Ambegaon Pathar.“The rupture occurred at a low-lying point where the pipeline is subjected to high pressure. Upon receiving information about the incident, the team stopped pumping water into the pipeline,” said Pavneet Kaur, additional municipal commissioner.“During construction, the narrow road and the presence of underground water pipelines, electrical cables and sewer lines restricted access and made it difficult to achieve the required standard of workmanship at the joint. These conditions are considered likely contributing factors. Repair work is under way and is expected to be completed by Monday morning,” stated a release issued by PMC.The damage drew criticism from residents, including political leaders, who alleged that poor management of pipeline construction work had led to the incident.“On one hand, the civic body imposes water cuts every Thursday and advises citizens to conserve water. On the other, lakhs of litres of water are wasted due to a pipeline burst. The civic body must first plug its own leakages before advising citizens to save water,” said Pramod Bhangire, Shiv Sena’s city unit chief.Locals also reported damage to pipelines in the Hadapsar and Chandni Chowk areas.“The 45-lakh-litre water tank at the Hadapsar bus depot has started leaking even before becoming fully operational, exposing the poor quality of work. Despite repeated written assurances since March, officials have failed to resolve the water crisis. We demand an inquiry into the matter,” said Prashant Surse, a Congress leader.According to the civic body, the pipeline is 23km long and has approximately 3,000 welded joints. As part of the construction quality checks, hydrostatic testing was carried out on most sections. Where this testing was not feasible, the welds were examined using ultrasonic testing (UT).
