Chandigarh: Taking serious note of the recent collapse of a National Highway bridge in Patiala district, Punjab public works minister Harbhajan Singh ETO has directed senior field engineering officers to inspect all bridges falling under the jurisdiction of the Public Works Department (B&R) across the state.The minister has asked officers to undertake a comprehensive assessment of the structural condition of bridges, with particular attention to foundations, piers, abutments, decks and other critical components. Any cracks, deterioration or signs of structural distress must be assessed promptly and preventive measures taken, he said.He has directed that wherever necessary, specialised agencies, reputed technical institutions and structural engineering experts should be engaged to conduct detailed safety audits and non-destructive testing, particularly in the case of old and vulnerable bridges.The minister directed officers to complete the exercise on priority and properly document inspection findings along with recommendations for repairs, strengthening or rehabilitation. He said public safety could not be compromised and any potential structural risks must be addressed before they resulted in an accident.The directions were issued during a review meeting at which the minister also assessed the constituency-wise and division-wise progress of ongoing works on state highways and link roads being executed by the PWD.He instructed officers to ensure timely completion of projects under various schemes, including Special Assistance to States for Capital Investment scheme (SASCI), Pradhan Mantri Gram Sadak Yojana (PMGSY) and NABARD, in accordance with prescribed targets.With winter setting in, the minister also directed officials to ensure that lane markings and other road safety equipment were installed on roads where the work was still pending. He said these measures were particularly important to improve visibility and road safety during foggy conditions.The minister said the state govt was undertaking construction and renovation of around 45,000 km of roads across Punjab and stressed that all projects should be completed within stipulated timelines.
