Signature Bridge: 6 Years After, Lift Trial Runs Begin | Delhi News
New Delhi: Delhi govt has initiated repair work and trial runs of the long-defunct inclined lift system at Signature Bridge to ascertain whether it can be used.The lifts, designed for a 154-metre-high viewing deck, were constructed in 2019-20 as part of the tourism aspect of the Rs 1,500-crore project. But the lifts are currently non-functional…
