Hyderabad: The Musi Jan Andolan (MJA) has demanded the govt to place all the Detailed Project Report (DPRs) of Musi riverfront development project in public including hydrological studies, and certified boundary maps. The MJA, which boycotted the stakeholder consultation meeting organised by the Musi Riverfront Development Corporation Limited (MRDCL) on Musi project, termed the exercise a deceptive, post-facto farce, The leaders said that the state govt is staging closed-door token consultations only after already issuing tenders for project works and advertising the controversial Musi riverfront project to investors at the upcoming Global Investment Summit.Addressing a press conference at Somajguda press club on Saturday, the MJA activists and affected people including Sajaya K, Sandhya V, Syed Bilal, Vishali, Ruchith Asha Kamal, Sanjeev, Lissy Joseph, Shailendra, Subbalakshmi, Kondal Rao and Sudha Goparaju, alleged that the cabinet sub-committee, chaired by the deputy CM constituted for this purpose has completely abdicated its political responsibility of hearing people’s voices to a mere implementing agency, which is a vested interest party.“The MRDCL issued a sudden invitation to MJA on November 25 for a 90-minute consultation scheduled for November 28. The MJA demanded that before any such meeting, the Detailed Project Report (DPR), comprehensive environmental and social assessments, and river boundary maps be proactively placed in the public domain in English, Telugu, and Urdu. Genuine civic consultation requires stakeholders to have access to full project documentation, adequate time to review impacts on displacement and livelihoods, and an institutional dialogue led by the cabinet sub-committee. It is shocking and conniving that the MRDCL had already issued tenders for Zone-IA and Zone-IB of the riverfront project in October itself,” the leaders said.The final bidding submission deadline for these tenders as it is listed on the Asian Development Bank (ADB) website was set for 5:00 PM on 27th November 2026: the exact same deadline given to civil society to confirm attendance for the consultation, they said.The MJA leaders alleged that calling for stakeholder consultations after closing the tenders for project works completely strips the consultation of any integrity or material consequence. They asserted that presenting an already finalized, tendered commercial design to the stakeholders after decisions have already been sealed is not dialogue; it is an undemocratic attempt to manufacture rubber-stamp legitimacy for an anti-people, anti-river project.The leaders demanded abolition of the corporate Special Purpose Vehicle (MRDCL), which operates without democratic oversight, and establish a statutory, participatory Musi River Basin Authority comprising elected local representatives, riparian community members, independent hydrologists, environmentalists and civil society. The leaders said while the ADB claims project loan Rs 4,5000 crore is in conceptual stage, the MRDCL has already issued tenders and is in the process of finalisation.
