WR deploys three 500-tonne cranes to build bridges in synchronised op | Ahmedabad News


WR deploys three 500-tonne cranes to build bridges in synchronised op

Ahmedabad: In a synchronised engineering operation, Western Railway’s Ahmedabad division deployed three 500-tonne-capacity cranes simultaneously to construct three railway bridges within a single traffic block on the Viramgam-Samakhiali section in Morbi district. The operation brought together heavy machinery with a combined capacity of 1,500 tonnes to complete work that would otherwise have required multiple stages of execution, the railways said.Western Railway officials said that the operation was carried out between Wadharva and Maliya Miyana and involved construction of water-discharge structures at bridges. The simultaneous deployment of all three cranes enabled the engineering teams to undertake work at the three locations within the same block, minimising disruption to train operations.The new structures will improve floodwater drainage and reduce the risk of soil erosion beneath railway tracks and damage to embankments.The achievement is part of a wider flood-protection initiative in the Maliya Miyana region, which has suffered major floods in 1979, 2017 and Aug 2024. The division has also built around 3.7 km of protective walls and 12 additional drainage openings to strengthen vulnerable railway stretches.The improvements are expected to enhance the reliability of passenger and freight traffic on the crucial network connecting Kandla and Mundra ports with industrial centres across the country.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *